Government Affair
National Energy Efficiency Action Plan 2.0 Study Focus Working Group Workshops No. 2
Venue: Bangi Resort Hotel
Date: 18 Dec 2023 - 20 Dec 2023
Time: 9:00am - 5:00pm
Download: More Information
| Chapter Chair: | GAC |
| Event: | National Energy Efficiency Action Plan 2.0 Study Focus Working Group Workshops No. 2 |
| Organization: | Suruhanjaya Tenaga (ST) |
| Government Agency | Ministry of Natural Resource, Energy and Climate Change (NRECC) |
| Date: | 18/12/2023 to 20/12/2023 |
| Time: | 9.00am to 5.00pm |
| Place: | Bangi Resort Hotel |
| Report By: | Chea Suei Keong |
| MASHRAE Rep: | Chea Suei Keong, Tee Tone Vei, Ir Ong Ching Loon, Ir Chen Thiam Leong, Ir Leong Siew Meng, Ir Lam Kim Seong and Ng Wen Bin. |
| Report: | The curren National Energy Efficiency Action Plan 1.0 (NEEAP1.0) entered thelast phase, and Suruhanjaya Tenaga was tasked to prepare for the next 10 years Action Plans to help Malaysia Energy Users to efficiently using the Energy. |
| Under the Development and Study of National Energy Efficiency Action Plan 2.0 (NEEAP2.0), Suruhanjaya Tenaga (ST) commenced the series of Focus Working Group for Industrial, Commercial and Residential Sectors. The purpose was to get Stakeholders, identified by ST, to propose Initiatives and Action Plans to be implemented during the period of 2026 to 2035. | |
| The objectives for NEEAP2.0: | |
| 1. Untuk menghasilkan dokumen Rangka Kerja Dasar Kecekapan dan Konservasi Tenaga Negara. | |
| 2. Untuk mengenal pasti inisiatif kecekapan tenaga yang akan dilaksanakan di Malaysia untuk 10 tahun akan datang dari 2026 hingga 2035. | |
| 3. Untuk menyemak dan mengukur anggaran kesan daripada penguatkuasaan Rang Undang-Undang Kecekapan dan Konservasi Tenaga di Malaysia. | |
| The Focus Working Group No. 2 for End User/Residetial sector listed as follow: | |
| 1. Suggest key EE initiatives which can be implemented for both thermal and electrical energy use that will contribute towards industrial/commercial/residential sector energy consumption reduction. | |
| 2. Quantify the impact of your suggested EE initiatives (percentage of savings of low, medium & high investment initiatives). | |
| 3. Establish progressive targets (percentage) & timelines. |
FWG-1 Industrial Sector, 18.12.2023

FWG-2 Commercial Sector, 19.12.2023

FWG-3 residential Sector, 20.12.2023

< Back

